The new mill is built on a plot of 160,000 m ² located on the outskirts of the municipality, including a factory with 12 production lines and more than 11,000 m ², four industrial ships, several wineries and a social building of 2 floors, with 1,800 m built.
The project has involved the movement of 145,000 m ³ of land and the use of 1,200 pilotes in diameter of 45 cm. At 85 cm. And from 14 to 18 m deep; 15,000 m ³ of concrete; 1,215,000 kg. Of steel in structure; 35,000 m ² in deck and panal plates; and 6,151 m of drainage pipes for tributary driving. The land also required the lifting of a containment wall to avoid landslides. There have also been 500 trees planted.